BOM Preparation Guide

BOM Preparation Guide for Wire Harness and Cable Assembly Projects

A practical guide to preparing BOM files for custom wire harness and cable assembly projects, including wires, connectors, terminals, housings, labels, sleeves and material notes.

A clear BOM helps reduce uncertainty during quotation review, sample discussion and production preparation. This guide explains what information is useful in a BOM and how it supports drawings, samples, connector details and RFQ review.

Use this guide when preparing a component list for a wire harness, cable assembly, sample-based project or repeat production review.
BOM basics

What Is a BOM for Wire Harness and Cable Assembly Projects?

A BOM is a component list used to identify the parts required for a custom wiring project. For wire harness and cable assembly projects, it helps connect material requirements with drawings, samples and RFQ review.

A BOM, or bill of materials, is a component list used to identify the parts required for a wire harness or cable assembly project. For custom wiring projects, a BOM may include wires, cables, connectors, terminals, housings, sleeves, labels, heat shrink tubing, protective materials and packaging notes.

A BOM does not replace drawings, wiring diagrams or samples. Instead, it works together with those files to help confirm what components are required, which parts are specified by the customer and which details may still need clarification before quotation or production.

Preparing a complete RFQ package?

The BOM should be reviewed together with drawings, connector details, pinout, quantity and testing requirements.

RFQ review

Why BOM Files Matter for RFQ Review

For custom wire harness and cable assembly projects, small component differences can affect quotation, production preparation and sample accuracy. A BOM helps the manufacturer understand which materials need to be reviewed before moving forward.

01

Component Clarity

A BOM helps identify the wires, connectors, terminals, housings, sleeves, labels and other parts required for the assembly.

02

Quotation Accuracy

Clear component information helps reduce assumptions during quotation review, especially when specific brands, part numbers or material requirements are involved.

03

Production Preparation

A BOM supports material review, sample preparation, purchasing discussion and repeat production consistency after specifications are confirmed.

BOM checklist

What to Include in a BOM

A useful BOM does not need to be complicated, but it should clearly identify the major components used in the wire harness or cable assembly. If some information is not available yet, you can still provide the details you have and mark uncertain items for review.

  • Item number or component reference
  • Component name or description
  • Connector brand and part number
  • Terminal or contact part number
  • Housing or plug type
  • Wire gauge and wire specification
  • Cable type or cable construction
  • Sleeve, conduit or protective tube
  • Heat shrink tubing or insulation material
  • Labels, markers or identification notes
  • Quantity per assembly
  • Color, length or size notes
  • Approved equivalent parts, if acceptable
  • Customer-specified parts or restricted replacement options
  • Packaging or special handling notes
Critical components

Connector, Terminal and Housing Information

Connectors, terminals and housings are often critical BOM items. When these details are unclear, the project may require additional confirmation before quotation, sample preparation or production discussion.

Connector Information

Useful connector information may include connector brand, series, part number, position count, mating direction and whether equivalent components are acceptable.

Terminal or Contact Information

Terminal information may include terminal part number, compatible wire range, plating requirement and whether the terminal is customer-specified.

Housing or Plug Information

Housing information may include housing type, locking structure, cavity count, keying direction, color and mating component reference when available.

Material details

Wire, Cable, Sleeve and Label Details

Wire and cable information should be clear enough to support material review. Protective materials, labels and sleeves should also be listed when they are part of the finished assembly.

01

Wire and Cable

Include wire gauge, conductor type, insulation material, color, cable structure, shielding requirement and any customer-specified cable type.

02

Protective Materials

List sleeves, conduits, braided sleeving, heat shrink tubing, protective tubes or other materials used for routing, insulation or protection.

03

Labels and Markers

Include label type, marker position, printed text, numbering system or identification requirement when labels are part of the assembly.

Quantity and notes matter too.

Show quantity per assembly and add notes for special handling, approved alternatives, uncertain items or parts that need confirmation.

File workflow

How BOM Files Work with Drawings and Samples

A BOM is most useful when it is reviewed together with drawings, wiring diagrams, connector details and samples. Each file provides a different part of the project information.

01

BOM File

The BOM identifies the components and materials required for the assembly, including wires, connectors, terminals, housings, sleeves and labels.

02

Drawing or Wiring Diagram

Drawings and wiring diagrams help confirm structure, cable length, branch length, connector position, labels, routing and wire sequence.

03

Sample or Photo Reference

Samples or photos can help review structure, connector direction, routing and application context when files are incomplete or unclear.

Common gaps

Common BOM Problems in Wire Harness and Cable Assembly Projects

Many quotation reviews are delayed because BOM information is incomplete, inconsistent or difficult to match with drawings and samples. The following issues are common in custom wiring projects.

  • Connector part numbers are missing or incomplete
  • Terminal and housing information is not listed separately
  • Wire gauge or wire specification is unclear
  • Cable color, length or construction is not defined
  • BOM item numbers do not match the drawing
  • Equivalent parts are not approved or restricted clearly
  • Labels, sleeves or heat shrink materials are missing
  • Quantities per assembly are not shown
  • Sample parts differ from the BOM
  • Testing or packaging notes are not included

Missing BOM details can still be reviewed.

If your BOM has missing information, it can still be used as a starting point. Mark uncertain items clearly and provide any available drawings, samples, photos or application notes for review.

Related resources

Related Guides and Resources

These pages may help you prepare a more complete project package before sending a wire harness or cable assembly RFQ.

FAQ

BOM Preparation Questions

These answers cover common questions about preparing BOM files for wire harness and cable assembly quotation review.

What should a BOM include for a wire harness project?
A BOM for a wire harness project may include wires, cables, connectors, terminals, housings, sleeves, heat shrink tubing, labels, protective materials, quantities, approved part numbers and material notes.
Can I request a quote if my BOM is incomplete?
Yes. You can send the available BOM together with drawings, photos, samples or application notes. WireLoomTech can review the information and help identify what additional details may be needed.
Does a BOM replace a drawing or wiring diagram?
No. A BOM identifies the components used in the assembly, while drawings or wiring diagrams help show structure, cable length, branch length, connector position, wire sequence and routing details.
Should connector and terminal part numbers be included in the BOM?
Yes, when available. Connector, terminal and housing part numbers help reduce uncertainty during quotation review, material confirmation, sample preparation and production discussion.

Need Help Reviewing Your BOM for a Custom Wiring Project?

Send your available BOM files, drawings, connector details, samples, photos, quantity and testing requirements. WireLoomTech will review the information and follow up for quotation discussion.